OPC approves grant for Newport Bay Water Wheel
At its October 25, 2018 meeting, OPC approved a $1.68 million Proposition 1 grant to the City of Newport Beach for planning and implementation of the Newport Bay Water Wheel project. The staff recommendation is available here and links to the related exhibits are on the meeting agenda page (see meeting link above).
After planning and permitting are completed, the Water Wheel will be installed in approximately 2020. It will operate on creek flow and solar power to remove floating trash and debris in San Diego Creek before it enters the Upper Newport Bay marine protected area and the Pacific Ocean. It will be located within and along San Diego Creek above Upper Newport Bay.
Modeled closely on the design of the highly successful Baltimore Trash Wheel project, the Newport Bay Water Wheel could immediately reduce trash load reductions of 50%-80% once installed, according to estimates by the City of Newport Beach. Follow Mr. Trash Wheel on Twitter to learn more.